
WFXConnected Workforce
Workforce Enablement
The right people. Proven ready. On every shift. Workforce, training, competence, labour and HSE in one application on Ignition, with one readiness decision gating stations, rosters, dispatch and permits.
The challenge
Manufacturing runs on people, yet the record of what those people may do is scattered: training in learning systems, certificates in spreadsheets, qualifications in a supervisor's head, hours in payroll and safety files in yet another system, none of them connected to the line. The gaps surface at the worst moments: an operator at a station they are not qualified for, an expired licence discovered mid-audit, a shift that starts short because nobody saw it coming.
Overview
Workforce Enablement (WFX) brings workforce, training, competence, labour and HSE management into one application running natively on the Ignition Perspective platform. At its core is a readiness engine: every position and station carries its requirements (certificates, skills, qualifications, inductions and fitness for work), and WFX evaluates every person against them continuously, rolling the result up to one state: Eligible, Warning, Restricted or Blocked. An expired regulatory certificate blocks work wherever it is required; an expiring one warns before it bites. One glance tells a supervisor who can take a station, and the same decision gates rosters, dispatch and permits.
The decision is also a history. WFX keeps the readiness state of every person for every day, so when an auditor asks who was allowed at a station on a given date, the answer is one click, not a week of spreadsheet archaeology. Around that core it manages the full employment lifecycle: onboarding that drives new starters step by step, training from classroom to e-learning, skills and automated certificate renewals, crews, time and attendance and labour planning, and a full HSE suite from incidents and permits to work through to musters and environmental limits.
On the floor, a QR code at every station opens its passport: requirements, qualified people, PPE, live permits and work instructions, and operators sign on with a badge scan that checks their readiness on the spot. WFX runs out of the box with an embedded database on the kiosks, tablets and phones the plant already uses, scales site by site over the Ignition Gateway Network, and backs every decision with 21 CFR Part 11 electronic signatures and an immutable audit trail.
Capabilities
What WFX does
Readiness Engine
- Requirements per position and station: certificates, skills, qualifications, inductions and fitness for work
- Four states, evaluated continuously: Eligible, Warning, Restricted and Blocked
- Expired regulatory certificates block work; expiring ones warn ahead
- Readiness history for every person and day, with a 90-day strip on each profile
- One decision gating stations, rosters, dispatch and permits
People & Onboarding
- Employees, contractors and temporary staff in one directory
- Departments, positions, budgeted headcount and vacancies
- Onboarding programmes that drive steps across WFX, TMS, WFM, APS, QMS, CMMS and the HRIS
- Contractor companies with insurance validity, inductions and their people's permits
Training
- Classroom, e-learning, blended, workshop, practical and on-the-job courses
- Session calendar with capacity, waitlists and e-signed attendance
- Enrolment approvals and learning paths
- Exams with question banks and multi-language delivery
- Practical observations
Skills & Certifications
- Five proficiency levels, from Not trained to Trainer, with per-skill descriptors
- Versatility matrix exposing cross-training gaps
- Station qualifications granted through e-signed authorisation
- Internal, external and regulatory certificates with verified documents
- Renewals pipeline that enrols people into refresher training before expiry
Labour & Dispatch
- Labour planning: demand from APS against the qualified supply per skill and shift
- Shift roster with crew rotations
- Time and attendance from badge punches, with exceptions and approvals
- Working-time rules from the EU Working Time Directive to each site's national limits
- Approved hours exported to payroll
- Dispatch ranks eligible people for TMS tasks; blocked candidates cannot be picked
Connected Worker
- Station passports by QR code: requirements, qualified people, PPE, live permits, JSA and TMS work instructions
- Badge sign-on that checks readiness on the spot
- Huddle boards for tiered daily management (SQCDPE) across Tiers 1, 2 and 3
- Toolbox talks with e-signed attendance
- Kiosks, tablets and phones; sign-ons made offline reconciled on reconnect
Health, Safety & Environment
- Incidents and near-misses with structured 5-Why investigations and corrective actions
- Jurisdiction profiles with recordability rules and reporting clocks, such as OSHA 29 CFR 1904 with OSHA 300/300A logs
- Permits to work (hot work, confined space, working at height, electrical isolation) tied to JSAs with before and after risk matrices
- PPE issue, stock and inspections; occupational health that never stores medical detail
- Behaviour-based safety observations, emergency drills and musters, and environmental limits from Ignition tags
- Where RCS also runs, safety figures flow to RCS for compliance reporting and disclosure, and environmental permits and limits are managed in RCS
AI, Governed
- Content Studio: SOPs and documents turned into draft courses, exams and translations for human review
- LS Assistant answers from your own WFX data; custom reports described in plain language
- No-code automations of triggers, conditions and actions
- MCP server exposing governed tools to external AI agents under scoped, expiring tokens
- Provider-agnostic, on premises if required, with daily budgets and identifier redaction; ships disabled
Multi-Site & Audit Trail
- Each site's own instance with an embedded store
- Configuration and operational data synchronised with a global instance over the Ignition Gateway Network
- 21 CFR Part 11 electronic signatures and an immutable, verifiable audit trail
- Pseudonymised datasets for MI analytics and notifications through MNS
Benefits
Why manufacturers choose WFX
Competence proven on demand
The evidence of competence and compliance is already assembled when an auditor asks.
One readiness decision
The same decision gates stations, rosters, dispatch and permits.
Fewer surprises
Expiries warn ahead, and renewals enrol people into refresher training themselves.
Faster time to competency
Time to competency is measured per department.
One workforce record
HR, training, labour and HSE work from the same record of who can do what.
Cross-training gaps in view
The versatility matrix shows gaps before they hurt coverage.
Jurisdiction-ready HSE reporting
Recordability rules, reporting clocks and logs per site, out of the box.
No extra servers
Runs on your existing Ignition infrastructure.
Sites run autonomously
Each site keeps working offline and synchronises when the link returns.
Knowing who is on shift is not enough. WFX shows who is qualified and ready for each station and flags gaps before work begins.
Ask WFX in plain language
LS Assistant, the AI assistant in every Logical Systems application, answers questions from your live WFX records and shows the sources behind every answer. It keeps learning as your records, work instructions and resolved issues grow, and your data is never used to train AI models.
Answers with sources
Every answer cites the records and work instructions it used.
Your role, your site
It sees only what each user is allowed to see.
Asks before it acts
Every change it proposes needs a person's confirmation and is audited.
18 languages, voice on mobile
Questions, answers and content in your teams' languages.
Integration
Connects to the systems you run
Systems & protocols
- Ignition Perspective on kiosks, tablets and phones
- Badge readers and station QR codes
- TMS tasks and work instructions
- APS labour demand
- QMS and CMMS actions
- RCS compliance reporting and disclosure
- HRIS and payroll
- MI analytics
- MNS notifications
- LLM-compatible AI endpoints
Standards
- 21 CFR Part 11
- OSHA 29 CFR 1904
- EU Working Time Directive
Datasheet
Workforce Enablement datasheetWorks with
Related solutions
See WFX in action
Book a demo with our engineers, using scenarios from your own plant.